What We Do
A Complete Solution of Planning, Construction Engineering & Construction Management
Service & Expertise
“Smart Work in AI Algorithm not hard work”
- Area efficiency to minimize common areas.
- Derived advanced construction methodology.
- Detailed Dynamic Checklists for pre, during, and post-construction to execute errorfree construction.
- Time saving Formats in Excel (Safety, Quality & Billing).
- Risk assessment and management before project execution.
- Secured contract management to control contractors and external agencies.
- Site Logistic Plan.
- Organogram.
- Construction Worker Histogram.
- Safety Standard Policy as per BOCW 1996 & Odisha rule 2002 & IS 10386-1.
- Life Saving Rules.
- Standard Quality Policy.
- Project Supervision & Auditing.
- Bar bending Schedule relevant to IS2502.
“A perfect system that makes a building properly functional and safe in terms of shock proofing and smart home concepts.”
“A perfect guideline to face any kind of Audit based on TIME, COST&CONTRACT, QUALITY & SAFETY.” & also can challenge Consumer Portal Act.
- Hazard Identification Risk Assessment, And Control (HIRAC).
- Amendment & Escalation Record.
- Drawing Transmittal Record.
- Project Instruction Record.
- Project Hinderance Record.
- Project Material Reconciliation Record.
- Bar Bending Schedule Record.
- Construction Quality Monitoring Record.
- Construction Checklist Record.
- Safety Monitoring Record.
- Testing & Result Record.
- Manufacturer Testing Certificate Record.
- Quantity & Cost Variation Record.
- Drawing Modification Record.
- Payment Checklist & Tracking Record.
- Pictorial Progress Record.
“A perfect guideline to minimise the cost at every minutes.”
- Project Gist & Configuration.
- Basic Cost & Market Survey.
- Plant & Machinery Analysis per Construction Item’s Volume.
- Curing Analysis.
- BOQ with Comparison of Material, Labor, and Plant-Machinery Charges.
- Scaffolding Design & Analysis for Form Work.
- Dynamic Man, Master-Sub Contractor Rate Survey.
- Master Schedule Depreciation Cost Analysis.
- Electricity Load Calculation & Cost Analysis.
- Dynamic Item Contract Rate Analysis.
- Overhead-Zero in an Analytical Way.
- Staff Mobilization-Zero in an Analytical Way.
- Proper Procurement & Material Management as per IS4082.
- Loss/Profit Statement.